Skip to main content Accessibility help
×
Hostname: page-component-77c89778f8-7drxs Total loading time: 0 Render date: 2024-07-16T15:35:01.954Z Has data issue: false hasContentIssue false

2 - Improving the Facilities

Published online by Cambridge University Press:  27 February 2024

Get access

Summary

In a report presented to the Board of Admiralty in August 1814, John Rennie highlighted three specific limitations upon the value of Chatham as a dockyard, all of them requiring immediate attention [84]. The three problems to which he referred were the difficulties and hazards of navigating the Medway, the shallowness of the dry docks and the poor arrangement of the yard. To correct these shortcomings, over the next fifty years, the Admiralty expended a great deal of time and effort. Rennie's all-encompassing and immediate solution, the transformation of Limehouse and Chatham Reaches into a massive enclosed basin for the mooring of ships in a controlled level of water, was never adopted. However, it was an idea to which he returned in 1821 [105].

The hazards of navigating the river primarily resulted from an inadequate depth of water and the existence of numerous treacherous shoals. Furthermore, there was considerable evidence to show that the problem was getting worse [95]. Identified as a major factor in the process of shallowing was the existence of Rochester Bridge and its immense stone supports (or starlings). This reduced the flow of the current and inhibited the natural scouring of accumulated silt [96]. Much attention was, therefore, given to a complete replacement of the Bridge [93, 99]. Other factors, either actual or potential, were also examined and commented upon throughout the period [93, 117, 118]. Despite the partial rebuilding of Rochester Bridge, the reshaping of the dockyard wall [87, 117, 120] and the removal of a number of further obstacles that contributed to a reduction in the flow of the Medway, it was ultimately the utilisation of more efficient dredgers [89, 112, 119] and use of paddle steamers for the towing of ships [116] that made the greatest contribution to improved navigation of the Medway. However, the problem still existed in 1857 [120].

The second problem to which Rennie alluded in his submission of 1814 was the shallowness of the dry docks and their poor state of upkeep. At the time the Admiralty agreed that all dry docks should undergo a thorough repair and improvement. At the same time, Rennie suggested the construction of a series of new docks. The Admiralty accepted the need for one new dock. This was built between Nos 2 and 3 docks [88]. Although preparatory work began in 1816, the first stone was not laid until March 1818 [98].

Type
Chapter
Information
Chatham Dockyard, 1815-1865
The Industrial Transformation
, pp. 53 - 112
Publisher: Boydell & Brewer
First published in: 2024

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Save book to Kindle

To save this book to your Kindle, first ensure coreplatform@cambridge.org is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

Available formats
×