Hostname: page-component-848d4c4894-8kt4b Total loading time: 0 Render date: 2024-06-28T06:00:00.879Z Has data issue: false hasContentIssue false

BRANCHING TECHNIQUE FOR A BI-OBJECTIVE TWO-STAGE ASSIGNMENT PROBLEM

Published online by Cambridge University Press:  15 August 2022

EKTA JAIN
Affiliation:
MCM DAV College for Women, Chandigarh, India; e-mail: ekta_jain30@yahoo.com
KALPANA DAHIYA*
Affiliation:
University Institute of Engineering and Technology, Panjab University, Chandigarh, India
VANITA VERMA
Affiliation:
Department of Mathematics, Panjab University, Chandigarh, India; e-mail: v_verma1@yahoo.com

Abstract

We discuss a bi-objective two-stage assignment problem (BiTSAP) that aims at minimizing two objective functions: one comprising a nonlinear cost function defined explicitly in terms of assignment variables and the other a total completion time. A two-stage assignment problem deals with the optimal allocation of n jobs to n agents in two stages, where $n_1$ out of n jobs are primary jobs which constitute Stage-1 and the rest of the jobs are secondary jobs constituting Stage-2. The paper proposes an algorithm that seeks an optimal solution for a BiTSAP in terms of various efficient time-cost pairs. An algorithm for ranking all feasible assignments of a two-stage assignment problem in order of increasing total completion time is also presented. Theoretical justification and numerical illustrations are included to support the proposed algorithms.

MSC classification

Type
Research Article
Copyright
© The Author(s), 2022. Published by Cambridge University Press on behalf of Australian Mathematical Publishing Association Inc.

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

Aggarwal, V., “The assignment problem under categorized jobs”, European J. Oper. Res. 14 (1983) 193195; doi:10.1016/0377-2217(83)90312-0.CrossRefGoogle Scholar
Aggarwal, V., Tikekar, V. G. and Hsu, L. F., “Bottleneck assignment problems under categorization”, Comput. Oper. Res. 13 (1986) 1126; doi:10.1016/0377-2217(83)90312-0.CrossRefGoogle Scholar
Bakhshi, H. C., Bhatia, H. L. and Puri, M. C., “Ranking assignments in order of increasing completion time”, Optimization 11 (1980) 455464; doi:10.1080/02331938008842672.Google Scholar
Bansal, S. and Puri, M. C., “A min max problem”, Z. Oper. Res. 24 (1980) 191200; doi:10.1007/BF01919246.Google Scholar
Brandt, A. and Intrator, Y., “The assignment problem with three job categories”, Casopis Pestovani Mat. 96 (1971) 811; http://eudml.org/doc/21073.Google Scholar
Burkard, R. E. and Cela, E., “Heuristics for biquadratic assignment problems and their computational comparison”, European J. Oper. Res. 83 (1995) 283300; doi:10.1016/0377-2217(95)00007-D.CrossRefGoogle Scholar
Burkard, R. E., Cela, E. and Klinz, B., “On the biquadratic assignment problem”, in: Quadratic assignment and related problems, DIMACS workshop, Volume 16 (eds. Pardalos, P. M. and Wolkowicz, H.), (American Mathematical Society, Providence, RI, 1993) 117146; doi:10.1090/dimacs/016/05.Google Scholar
Cela, E., The quadratic assignment problem: theory and algorithms (Springer, Boston, MA, 1997); doi:10.1007/978-1-4757-2787-6.Google Scholar
Cox, I. J. and Miller, M. L., “On finding ranked assignments with application to multitarget tracking and motion correspondence”, IEEE Trans. Aerosp. Electron. Syst. 31 (1995) 486489; doi:10.1109/7.366332.Google Scholar
Dantzig, G. B., “Linear programming”, Oper. Res. 50 (2002), 4247; doi:10.1287/opre.50.1.42.17798.CrossRefGoogle Scholar
Ehrgott, M., Stephan, T. and Tenfelde-Podehl, D., “A level set method for multiobjective combinatorial optimization: application to the quadratic assignment problem”, Pac. J. Optim. 2 (2002) 521544; https://kluedo.ub.uni-kl.de/frontdoor/index/index/docId/1352.Google Scholar
Hamacher, H. W. and Queyranne, M., “ K best solutions to combinatorial optimization problems”, Ann. Oper. Res. 4 (1985) 123143; doi:10.1007/BF02022039.Google Scholar
Hammadi, A. M. K., “Solving multi objective assignment problem using tabu search algorithm”, Glob. J. Pure Appl. Math. 13 (2017) 47474764; https://www.ripublication.com/gjpam17/gjpamv13n9_28.pdf.Google Scholar
Ismayilova, N. A., SagIr, M. and Gasimov, R. N., “A multiobjective faculty-course-time slot assignment problem with preferences”, Math. Comput. Model. 46 (2007) 10171029; doi:10.1016/j.mcm.2007.03.012.CrossRefGoogle Scholar
Jain, E., Dahiya, K., Sharma, A. and Verma, V., “An improved algorithm for two stage time minimization assignment problem”, J. Comb. Optim. 37 (2019), 713736; doi:10.1007/s10878-018-0318-2.CrossRefGoogle Scholar
Kaur, P., Sharma, A., Verma, V. and Dahiya, K., “A priority based assignment problem”, Appl. Math. Model. 40 (2016) 77847795; doi:10.1016/j.apm.2016.03.038.CrossRefGoogle Scholar
Loiola, E. M., de Abreu, N. M. M., Boaventura-Netto, P. O., Hahn, P. and Querido, T., “A survey for the quadratic assignment problem”, European J. Oper. Res. 176 (2007) 657690; doi:10.1016/j.ejor.2005.09.032.CrossRefGoogle Scholar
Miller, M. L., Stone, H. S. and Cox, I. J., “Optimizing Murty’s ranked assignment method”, IEEE Trans. Aerosp. Electron. Syst. 33 (1997) 851862; doi:10.1109/7.599256.Google Scholar
Murty, K. G., “An algorithm for ranking all the assignments in order of increasing cost”, Oper. Res. 16 (1968) 682687; doi:10.1287/opre.16.3.682.CrossRefGoogle Scholar
Pardalos, P. M. and Pitsoulis, L. S. (eds.), Nonlinear assignment problems: algorithms and applications, Volume 7 of Combinatorial Optimization (Springer, New York, 2000); doi:10.1007/978-1-4757-3155-2.CrossRefGoogle Scholar
Pascoal, M., Captivo, M. E. and Climaco, J., “A note on a new variant of Murty’s ranking assignments algorithm”, Q. J. Belg., French Italian Oper. Res. Soc. 1 (2003) 243255; doi:10.1007/s10288-003-0021-7.Google Scholar
Pedersen, C. R., Nielsen, L. R. and Andersen, K. A., “An algorithm for ranking assignments using reoptimization”, Comput. Oper. Res. 35 (2008) 37143726; doi:10.1016/j.cor.2007.04.008.CrossRefGoogle Scholar
Pintea, C.-M. and Vescan, A., “Component-based ant system for a biobjective assignment problem”, Stud. Univ. Babes-Bolyai Inform. 52 (2007) 2132; https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.105.8253&rep=rep1&type=pdf.Google Scholar
Przybylski, A., Gandibleux, X. and Ehrgott, M., “Two phase algorithms for the bi-objective assignment problem”, European J. Oper. Res. 185 (2008), 509533; doi:10.1016/j.ejor.2006.12.054.CrossRefGoogle Scholar
Seshan, C. R., “Some generalisations of the time minimising assignment problem”, J. Oper. Res. Soc. 32 (1981) 489494; doi:10.1057/jors.1981.99.CrossRefGoogle Scholar
Yadaiah, V. and Haragopal, V. V., “Multi-objective optimization of time-cost-quality using Hungarian algorithm”, Amer. J. Oper. Res. 6 (2016) 3135; doi:10.4236/ajor.2016.61005.Google Scholar