Hostname: page-component-84b7d79bbc-fnpn6 Total loading time: 0 Render date: 2024-07-26T05:24:03.314Z Has data issue: false hasContentIssue false

Slag splashing at the Fos steelplant: new converters scheduling and results

Published online by Cambridge University Press:  18 May 2005

Get access

Abstract

Slag splashing is a way of maintaining converters lining, started at the Fos steel plant in December 2003. Systematic slag splashing on converters lining, by nitrogen injection with the top lance, after tapping, protects refractory. The aim of the project is to disconnect the two converters, from the refractory point of view, and to reach a refractory lining lifetime of 5,000 heats.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2005

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)