Hostname: page-component-84b7d79bbc-g78kv Total loading time: 0 Render date: 2024-07-30T02:32:19.736Z Has data issue: false hasContentIssue false

Technological challenges in stainless steel production at Outokumpu Stainless Tornio

Published online by Cambridge University Press:  18 May 2005

Get access

Abstract

Led by increasing stainless steel demands worldwide, Avesta Polarit Tornio, now Outokumpu Stainless Tornio, decided to extend its slab production capacity from 650,000 to 1.65 million tons per year of cast products. To supply 1.0 million tons of additional slabs, a complete new steel plant was successfully started up in September 2002. The process route includes a 140 MVA electric arc furnace, a 150 tons AOD, a twin ladle furnace and the world most advanced continuous casting machine. Technological highlights together with operational results are presented.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2005

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)