Article contents
Stochastic Flow-Shop Scheduling with Lateness-Related Performance Measures
Published online by Cambridge University Press: 27 July 2009
Abstract
In this paper we consider stochastic flow-shop scheduling with reference to certain lateness-related performance measures. We show that for various assumptions on the distribution of job-processing times of a flow shop, certain scheduling policies following the stochastic analogy of the Earliest Due Date (EDD) rule yield optimal results.
- Type
- Articles
- Information
- Probability in the Engineering and Informational Sciences , Volume 5 , Issue 2 , April 1991 , pp. 245 - 254
- Copyright
- Copyright © Cambridge University Press 1991
References
- 1
- Cited by