Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
T'kindt, V.
and
Billaut, J.-C.
2001.
Multicriteria scheduling problems: a survey.
RAIRO - Operations Research,
Vol. 35,
Issue. 2,
p.
143.
Tacquard, Claudine
and
Martineau, Patrick
2001.
Automatic notation of the physical structure of a flexible manufacturing system.
International Journal of Production Economics,
Vol. 74,
Issue. 1-3,
p.
279.
Riane, Fouad
Artiba, Abdelhakim
and
Elmaghraby, Salah E.
2002.
Sequencing a hybrid two-stage flowshop with dedicated machines.
International Journal of Production Research,
Vol. 40,
Issue. 17,
p.
4353.
Tang, Lixin
Luh, Peter B.
Liu, Jiyin
and
Fang, Lei
2002.
Steel-making process scheduling using Lagrangian relaxation.
International Journal of Production Research,
Vol. 40,
Issue. 1,
p.
55.
Bertel, S.
and
Billaut, J.-C.
2004.
A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation.
European Journal of Operational Research,
Vol. 159,
Issue. 3,
p.
651.
Kis, Tamás
and
Pesch, Erwin
2005.
A review of exact solution methods for the non-preemptive multiprocessor flowshop problem.
European Journal of Operational Research,
Vol. 164,
Issue. 3,
p.
592.
Guirchoun, S.
Martineau, P.
and
Billaut, J.-C.
2005.
Total completion time minimization in a computer system with a server and two parallel processors.
Computers & Operations Research,
Vol. 32,
Issue. 3,
p.
599.
Andrés, Carlos
Albarracı́n, José Miguel
Tormo, Guillermina
Vicens, Eduardo
and
Garcı́a-Sabater, José Pedro
2005.
Group technology in a hybrid flowshop environment: A case study.
European Journal of Operational Research,
Vol. 167,
Issue. 1,
p.
272.
Oĝuz, Ceyda
and
Ercan, M. Fikret
2005.
A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks.
Journal of Scheduling,
Vol. 8,
Issue. 4,
p.
323.
Belkadi, K.
., M. Gourgand
., M. Benyettou
and
., A. Aribi
2006.
Sequential and Parallel Genetic Algorithms for the Hybrid Flow Shop Scheduling Problem.
Journal of Applied Sciences,
Vol. 6,
Issue. 4,
p.
775.
Belkadi, K.
., M. Gourgand
and
., M. Benyettou
2006.
Resolution of Scheduling Problem of the Production Systems by Sequential and Parallel Tabu Search.
Journal of Applied Sciences,
Vol. 6,
Issue. 7,
p.
1534.
Belkadi, K.
Gourgand, M.
and
Benyettou, M.
2006.
Parallel genetic algorithms with migration for the hybrid flow shop scheduling problem.
Journal of Applied Mathematics and Decision Sciences,
Vol. 2006,
Issue. ,
p.
1.
Ruiz, Rubén
and
Maroto, Concepción
2006.
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility.
European Journal of Operational Research,
Vol. 169,
Issue. 3,
p.
781.
Andres, Carlos
Gomez, Pedro
and
Garcia-Sabater, Jose P.
2006.
Comparing dispatching rules in dynamic hybrid flow shops.
p.
233.
Caricato, P.
Grieco, A.
and
Serino, D.
2007.
Tsp-based scheduling in a batch-wise hybrid flow-shop.
Robotics and Computer-Integrated Manufacturing,
Vol. 23,
Issue. 2,
p.
234.
Rodríguez, José Antonio Vàzquez
and
Salhi, Abdellah
2007.
Evolutionary Scheduling.
Vol. 49,
Issue. ,
p.
125.
Li, Tieke
and
Li, Yan
2007.
Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times.
p.
6665.
2007.
Handbook on Scheduling.
p.
271.
Bertel, S.
Fenies, P.
and
Roux, O.
2008.
Optimal cash flow and operational planning in a company supply chain.
International Journal of Computer Integrated Manufacturing,
Vol. 21,
Issue. 4,
p.
440.
Billaut, Jean‐Charles
Carlier, Jacques
Néron, Emmanuel
and
Oliver, Antoine
2008.
Production Scheduling.
p.
233.