Hostname: page-component-84b7d79bbc-5lx2p Total loading time: 0 Render date: 2024-08-02T10:32:24.979Z Has data issue: false hasContentIssue false

A Study of the Problem of Aërial Navigation, as affected by Recent Mechanical Improvements

Published online by Cambridge University Press:  08 May 2017

Get access

Abstract

Image of the first page of this content. For PDF version, please use the ‘Save PDF’ preceeding this image.'
Type
Other
Copyright
Copyright © Royal Aeronautical Society 1881

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

* See “Concluding Remarks.”

* Reprinted in the “Comptes Rundus,” vol. lxxi, p. 608.

The screw had often been proposed, at earlier times, as a mode of propelling Shipa, but it was not believed in till the date of Mr. F. P. Sinith‘s successful trial in November 1836. The “Archimedes,” the first large screw steamer, put to sea on the 15th May, 1839.

* A description of the balloon and its voyage was publinhed in “La Presse” of tbe 25th September, and waa reprinted eighteen yeara later in the “Comptes Rendus,” voL lxxi, p. 683. See also “Les Ballons Dirigeable,” by Gaston Tissandier. Paria. 1872. From which the figures are borrowed.

* These particulars will be found in several elaborate articles com-municated from time to time to the Academy of Sciences, and published in the “Comptes Reudus,” vols. lxxi and lxxi.

* Trans. Inst. Naval Architects, 1865.

Article by Mr. Pendred Ibid., 1876.

Ibid., 1876

* Trans. Inst. Naval Architects, 1864 and 1865.

* Rankine, “Rules and Tables,” p. 274.

* See data for a very large number of screw ships in “Bourne on the Screw Propeller.” 4to. London, 1867.

* The Author has found it necessary, for the sake of completeness, to incorporate in this Paper some passages previously published elsewheré.