Skip to main content Accessibility help
×
Hostname: page-component-77c89778f8-sh8wx Total loading time: 0 Render date: 2024-07-21T09:27:11.468Z Has data issue: false hasContentIssue false
This chapter is part of a book that is no longer available to purchase from Cambridge Core

Chapter 9 - Demolition

John Yarwood
Affiliation:
Formerly Director of Reconstruction, European Union Administration of Mostar
Get access

Summary

Note by John Yarwood

Central Mostar was a devastated area in 1994. As soon as possible, I invited five specialised consultancy firms to make a submission covering their track-record and approach. In the conditions obtaining, a quick decision was needed and I chose the Danish firm DEMEX, which was managed by a leading demolition and recycling expert, Erik Lauritzen. He proposed a partnership with a structural engineering firm, Rambøll, Hanneman and Højlund. After negotiation we signed a consultancy contract in early 1995. The first problem was the lack of a legal basis for demolition work to buildings which we did not own. Usually, the ownership was in dispute between Croats and Muslims. A decree was drafted to give us the necessary powers, which was signed by the Administrator (after consultation and agreement from both sides) on 19 March 1995.

To set up a comprehensive contract would have taken a long time, so we pursued very quickly a small ‘emergency contract’ which was awarded to the Scandinavian Demolition Company after an international tender on rates.

The major contract (1995/96) followed on, and Niels Strufe describes this here. It had a tremendous impact on the appearance of the city. Streets had been blocked by masses of fallen masonry. Building interiors were full of rubble. The city was in a horrific mess. Afterwards, of course, ruins were still evident, but they were clean and orderly. Doors and windows were neatly closed, streets were clear, unstable walls were propped by timber scaffolds, and structures exposed to rain were protected from further deterioration.

Type
Chapter
Information
Rebuilding Mostar
Urban Reconstruction in a War Zone
, pp. 70 - 73
Publisher: Liverpool University Press
Print publication year: 1999

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Save book to Kindle

To save this book to your Kindle, first ensure coreplatform@cambridge.org is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

  • Demolition
  • John Yarwood, Formerly Director of Reconstruction, European Union Administration of Mostar
  • Book: Rebuilding Mostar
  • Online publication: 05 January 2012
  • Chapter DOI: https://doi.org/10.5949/UPO9781846313905.011
Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

  • Demolition
  • John Yarwood, Formerly Director of Reconstruction, European Union Administration of Mostar
  • Book: Rebuilding Mostar
  • Online publication: 05 January 2012
  • Chapter DOI: https://doi.org/10.5949/UPO9781846313905.011
Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

  • Demolition
  • John Yarwood, Formerly Director of Reconstruction, European Union Administration of Mostar
  • Book: Rebuilding Mostar
  • Online publication: 05 January 2012
  • Chapter DOI: https://doi.org/10.5949/UPO9781846313905.011
Available formats
×